Why is Kiln 1 critical for MD right now?

Analyst

Kiln 1 is at 108% load while Mill 2 co-starts into the 10–11 peak TOD band. Incomer rolling MD is 4,680 kVA (6.4% headroom). Staggering starts is the highest-confidence prescription (rx_9001).

Sources & evidence

  • InfoPath H alarm:alm_1001 — Peak TOD overlap with Mill 2 start — ₹84k/mo addressable